Photo credit: ATLAS, TASK 59, Eurac
Principle Characteristics of the Building:
Ownership type: | Private |
Year of construction: | 1904 |
Renovation completed: | 2014 |
Floor area after works: | 2750 m² |
Structure: | Load bearing masonry structure that was cleaned and preserved. The roof and floors were re-finished and significant insulation added. Historic window frames were re-finished and high-performance secondary windows installed |
Heating and energy: | The existing converter station which connects the district heating with the heating system of the building was renewed. The attic floor is heated via floor heating, and there is a mixed heating system with radiators and radiant wall heating in other floors. The chapel on the ground floor of the building has heating on three sides. |
Energy performance: | Energy savings of 66% were achieved. |
Cost of works: | €5.1m |
Architect: | Trimmel Wall Architekten ZTGmbH |
Technical consultants: | kppk Ziviltechniker GmbH |