Efficient Buildings

advancing energy efficiency in European buildings

  • Home
  • About us
    • History & Objectives
    • Activity Reports
    • Members
    • Alliances
    • Team
    • Contact
  • Join us
  • News
    • Latest News
    • Media Coverage
  • Positions
    • Energy Performance of Buildings Directive (EPBD)
    • Energy Efficiency Directive (EED)
    • 2024 EU Elections Pledge
    • Position Papers
    • Publications
  • Actions
    • EPBD.wise
    • Renovate Europe Campaign
    • National Dialogue Events
    • Energy Council
  • Events
    • WEBINAR SERIES
      • 2025 EPBD Implementation Webinar Series: Delivering the EPBD On the Ground
      • 2022 EPBD Webinar Series
      • 2021 EPBD Webinar Series
      • 1st Edition Mini Online Workshops on the Renovation Wave
      • 2nd Edition Mini Online Workshops on the Renovation Wave
      • 3rd Edition Mini Online Workshops on the Renovation Wave
      • EPBD Implementation Webinars
    • EU Sustainable Energy Week
    • eceee
    • BUSINESS DAYS
      • 2019 Business Day
      • 20th Anniversary & Business Day 2018
  • Case Studies
    • New Buildings
    • Renovated Buildings
You are here: Home / Villa Castelli, Italy

Villa Castelli, Italy

Photos / Technical Drawing credit: ATLAS, TASK 59 and Eurac

Principle Characteristics of the Building:

Ownership type:  Private (owner occupied)
Year of construction:  1850-1899
Renovation completed:  2007
Floor area after works:  564m²
Structure:  The roof of the Villa has been completed replaced with a new laminated wood structure, with double-crimped aluminium sheets acting as the roof skin.  The windows and doors are triple glazed, filled with Argon and cased in a wood-aluminium frame.  The exterior walls are insulated from inside
Heating and energy:  A heat pump with a geothermal plant (probes) supplies the production of heating and cooling and hot water.  The heat for heating is distributed to the rooms through a radiant floor system.  Electrical energy is produced with a PV-system, integrated in the roofing and not visible from outside.  Micro wind turbines installed on the roof contribute to the production of electricity.
Energy performance:  18,27 kWh/m²/y representing a 90% energy demand reduction leading to ClimaHouse R certification.
Cost of works:  €1,500,000 (€2,660 m²)
Architect:   Valentina Cari
Technical consultants:  Oscar Stuffer

Efficient Buildings Europe | Disclaimer | Contact

  • Home
  • About us
  • News & Media
  • Positions
  • Actions