
Country:
Spain
Ownership:
Public building
Year of construction:
1850
Renovation completed:
2023
Floor area after works:
80,000 m²
Renovated buildings · Heritage buildings
Teatro Real de Madrid, Spain
The 1850 opera house in Madrid now runs on a fully electric heating and cooling system, with no need for fossil fuels. The upgrade, completed in 2023, saved 48% of its energy use.
Building envelope and structure
Monumental building.
Heating and energy
Update of the heating and cooling system through water-cooled chillers with screw compressors and speed regulators; air-cooled reversible heat pumps, with scroll compressors and high seasonal energy efficiency; air-cooled non-reversible heat pump, with scroll compressors and a high water production temperature.
Energy performance
After the works, the building benefits from a fully electric system, with no need for fossil fuels, energy savings of 48% and maximum reliability.
Project team
- Technical consultants: Carrier
